Summary:
NEMX was asked to move a 35-ton bailer unit from one location to another for a retail distribution center.
The Challenge:
Safety on these types of jobs is always the prime challenge as well as size of the machine, travel path and pedestrians.
Why this retail distribution client chose NEMX:
NEMX was chosen due to price, ability, reputation within the industry and timeline plan.
How NEMX Responded:
NEMX planned and executed the disassembly, move and reassembly seamlessly, safely, on time and on budget.
The Results:
The client was extremely satisfied with our mobilization and the quality in which we delivered the installation. Our dedication to our plan, safety and to the timeline won NEMX the respect and gratitude of our client.
During
During
After
Summary:
NEMX was asked to remove and reinstall a 60’ tall by 16” wide 20 ton bucket elevator with its head section sitting at 150’ in the air during a 12 day shutdown.
The Challenge:
Safety is always the concern with crane rigging at these or any heights. Ensuring safe operations and rigging practices was and will always be our first step to getting the job done. While the timeline was tight, the climb made for some tired tradespeople. Attention to detail on this job was paramount.
Why this meal distribution client chose NEMX:
NEMX was chosen due to price, ability, reputation within the industry and timeline plan.
How NEMX Responded:
NEMX planned and executed the project above expectations delivering the job on time and on budget.
The Results:
The client was extremely satisfied with our mobilization and the quality in which we delivered the installation. Our dedication to our plan, safety and to the timeline won NEMX the respect and gratitude of our client.
Before
During
After